Skip to content
Initial maintenance
- – It will take about 48 hours for the adhesive to harden after installation.
- – In addition, it should be ensured that coating should be carried out in a way that wax cannot penetrate inside.
Carry out coating back and forth while ensuring that wax does not drip from the waxing cloth.
Daily maintenance
- – Daily : Remove contamination on floors immediately and clean dust and any interfering objects every day.
- – Periodic : Depending on the state and usage of the floors, remove contamination periodically(3 days / 1 week / 1 month)
by using a wet cloth with neutral detergent and carry out wax-coating on the surface of the floors for the maintenance
purposes.
- – In case of wax-coating, it is required to carry out coating for 3 times.
- – When a local section is contaminated severely, the contamination can be removed by rubbing it with a wet cloth with
neutral detergent or alcohol.
- – Scratches can be removed through spray buffing.
- – If a wet cloth is used for cleaning and water is not completely removed, it could penetrate the connected section or the
boundary of the flooring, which causes the flooring to be loosened. Pay attention to it.
- – If in case solvents, paints of furniture, copy liquids, or chemicals (materials that contain acid and alkali) get spilled on the
products, immediately clean them using alcohol and not solvents, such as thinner Using solvents could spread the
contamination, which may cause softening or discoloration (Do not use thinner and acetone for removing contamination.)
- – Pay attention not to drag heavy furniture when moving it.
Go to Top